Main measures for safety production in the hottest

2022-08-09
  • Detail

Main measures for construction safety production

(1) documents of safety production regulations issued by the national government

(2) the owner's regulations on safety production

(3) company regulations and documents related to safety production

2. Safety disclosure before commencement

(1) before the commencement of the project, all personnel of the project shall accept the safety disclosure of the owner's safety department to understand the environmental conditions and safety precautions

(2) before the commencement of each work, the full-time safety officer shall make safety education disclosure to the construction personnel to make each construction personnel understand the potentially dangerous work and the safety measures to be taken

(3) keep the written records of disclosure

3. On site safety inspection

(1) establish a systematic on-site safety inspection system, and the formal safety inspection shall be conducted at least once a week

(2) the health and safety behaviors of each on-site personnel will be closely monitored and standardized

(3) rectify the problems found immediately. To eliminate hazards and ensure construction safety

4. On site safety inspection

(1) the power box for temporary power use at the construction site should be reasonably arranged. The power cable shall be laid safely and reliably. In order to prevent cable damage, it should be overhead or effectively laid. The setting of the distribution box is safe and eye-catching, and easy to use

(2) construction distribution boxes and panels should be equipped with power-off protectors and good grounding devices.]

(3) all electrical equipment for construction should be checked regularly and repaired or replaced in time if problems are found. After using the electrical equipment, be sure to turn off the power

(4) the shell of the switch of the distribution box and the knife switch should be kept intact by pushing the jaw with the help of external force. The fuse shall be determined according to the capacity of the equipment or line

(5) non electricians are strictly forbidden to install and connect electrical appliances and pull wires without authorization

5. Regulations on the use of construction machinery

(1) all kinds of machinery required on site must be maintained. The machine can be used only after its performance is confirmed to be in good condition

(2) all kinds of machinery that can be tested by tensile test on site should be equipped with fixed machines and fixed personnel. The operators of machinery for special construction should pass the examination and hold a safety operation certificate

(3) the construction machinery should have a good safety protection shell and be well grounded

(4) operators of all kinds of machinery should understand the use performance and operation requirements of construction machinery. Use should check whether it is intact, and the operation should comply with the operating procedures. If any fault is found, it should be repaired immediately. Overload use is strictly prohibited

6. Regulations on the use of hoisting machinery (crane)

(1) the use of large cranes and cranes must be operated in accordance with the construction scheme, and the energy and performance of the cranes used must be clear

(2) when using, a special person should be responsible for commanding, communicating with the driver and unifying the command signal to prevent misoperation due to unclear signal

(3) pay attention to the protection of underground cables, pipelines, trenches or other protective measures at the crane walking and parking places

(4) when the crane is lifting, the outrigger should be extended and the road base plate should be placed under the outrigger. The car body is placed stably. When lifting, walking, rotating and other actions are carried out, the commander should consider the surrounding conditions and consider it safe before commanding

(5) the sling used should have sufficient safety factor, and check the integrity of the wire rope

7. Regulations on safe use of fire

(1) oxygen, acetylene, paint and oil items must be set up in special areas, stored separately and clearly marked

(2) for places with dangerous goods such as inflammable and explosive places, smoke and fire warning signs should be hung, and corresponding fire-fighting and fire-fighting equipment should be equipped

(3) where fire is used, the fire permit shall be handled according to the regulations, fire prevention measures shall be formulated, and special personnel shall be assigned to take care of it. After work, the fire must be completely extinguished

(4) in the lower range of high-altitude hot work (electric welding, gas welding, cutting), if there are inflammables, they should be removed or covered with non inflammables, and special personnel should be assigned to watch

(5) when putting out a fire, the regulations that water and foam are strictly prohibited in electrical facilities should be observed. Paint, oil, asphalt, organic solution and other flammable liquids and water repellent chemicals, it is strictly prohibited to use water to extinguish the fire

(6) fire fighting equipment shall not be used for other purposes, and no objects shall be piled around to keep the road unobstructed

8. Six disciplines of safety production

(1) when entering the site, you must wear safety helmets, buckle safety belts and use personal protective equipment correctly

(2) if there are no safety facilities for suspended operation at a height of more than two meters, safety helmets, safety belts and safety hooks must be worn

(3) when working at heights, it is not allowed to throw materials and tools down or up so that they can be used to package objects

(4) all kinds of electric mechanical equipment must be equipped with leakage switches, reliable and effective safety grounding and lightning protection devices, and the hardness can be Brinell hardness, Rockwell hardness, Vickers hardness and microhardness before they can be used

(5) personnel who do not understand electricity and machinery are strictly prohibited from using and playing with electromechanical equipment

(6) non operators are not allowed to enter the hoisting area; The hoisting machinery must be in good condition, and no one is allowed to stand vertically below the climbing rod

9. Civilized construction

civilized construction is an important part of preventing safety accidents. Garbage, sundries and other flammable materials are piled up on the construction site. It will inevitably increase the risk of fire and the possibility of personal injury. Therefore, the management personnel and construction personnel of the project department are required to ensure a clean working environment. It must be done:

(1) the materials, tools and equipment used are properly placed

(2) clean up unused materials and garbage at any time and evacuate the site

(3) overflow fluid should be removed immediately

(4) excess materials, tools and equipment should not be placed at heights. Materials, tools and equipment placed at heights should be bound firmly when not in use to prevent falling injury

(5) acetylene and oxygen cylinders should be placed separately and covered when not in use to prevent gas leakage

(6) keep the traffic road unobstructed at any time

the management personnel of the project department shall conduct regular inspections to ensure the implementation of civilized construction regulations