How to make a 60 square meter decoration budget ta

2022-07-22
  • Detail

Project 1: Foundation Engineering

shovel the wall skin (gypsum ash) 200.00

wall blank base treatment 230.00

wall/ground cement mortar leveling 603.00

remove the brick wall (120 mm) 87.50

remove the brick wall (240 mm) 430.00

remove the original doors and windows and sets 55.00

light brick wall (120 mm double-sided plastering) 336.00

remove the hole after the wall Painting of beam bottom and other parts 450.00

dismantling of insulation wall 500.00

item 2: Waterway Circuit engineering

strong and weak current construction (lump sum price) 4800.00

waterway construction (lump sum price) 1550.00

change down pipe 370.00

change down pipe 189.00

balcony water outflow 300.00

Project III: guest restaurant and aisle

latex paint base treatment (putty) 1240.00

latex paint 496.00

gypsum board plane ceiling 224.00

gypsum board linear light trough ceiling 1232.50

shoe cabinet (including door and ecological board) 1190.40

gypsum board is sealed on the upper part of the cabinet 40.00

decorative cabinet, wine cabinet 1575.00

decorative cabinet, wine cabinet door 462.00

ceramic skirting 330.00

storage cabinet body (ecological board) 1440.00

storage cabinet door (ecological board) 363.00

General specification of floor tiles (500 × 500< Size ≤ 800 × 800) 1392.00

item 4: master bedroom

emulsion paint base treatment (putty) 1000.00

emulsion paint 400.00

wardrobe cabinet body (ecological board) 2592.00

wardrobe door (ecological board) 247.50

gypsum board 210.00

storage cabinet body (ecological board) 1248.00

storage cabinet door (ecological board) 330.00

item 5: secondary bedroom

emulsion paint base treatment (putty) 760.00

latex paint 304.00

wardrobe cabinet body (ecological board) 2160.00

wardrobe door (ecological board) 198.00

storage cabinet body (ecological board) 1056.00

item 6: kitchen

general specification of wall tiles (300 × 450 < size ≤ 300 × 600) 1000.00

kitchen and sanitary package pipes 156.00

item 7: bathroom

General specification of wall tiles (300 × 450 < size ≤ 300 × 600) 860.00

common specification of floor tiles (size 300 × 300) 169.60

toilet backfilling and surface leveling 224.00

toilet waterproof treatment 594.00

kitchen and sanitary package pipes 312.00

lintel paving 20.00

toilet sewer protection works 200.00

item 8: balcony

latex paint base treatment (batch scraping) 200.00

latex paint 80.00

General specification of wall tiles (300 × 450 < size ≤ 300 × 600) 340.00

balcony handrail base tiling 63.00

balcony waterproof treatment 45.00

Item 9: miscellaneous

materials upstairs fee 300.00

materials transportation fee 300.00

indoor garbage removal fee 300.00

lamp installation 200.00

sanitary ware installation 150.00

five gold installation 100.00

item 10: other charges

third party the supervisor 999.00

make a budget in advance, which can reduce the uncertain factors in the decoration, Try to reduce the possibility of substantial increase in costs. If you really don't know how to budget, it is necessary to compare the costs of the decoration company before. Just as it happens, Wuhan home decoration network provides decoration bidding services for the majority of Wuhan owners. You only need to enter the decoration bidding page of Wuhan home decoration network and fill in your name, phone number, community and other decoration information to participate in the bidding, According to your requirements, the platform can select 3 to 4 suitable decoration companies to measure the room for free and formulate decoration plans. The details are OK

太原男科医院

成都外阴白斑医院

西安妇科医院

Copyright © 2011 JIN SHI